Monday, October 26, 2015

Appliance Shopping and Rain Delay

This weekend we tackled appliance shopping. We have been looking at appliances for about the past 3 months and even added a bump out for the fridge in the plans before actually deciding on a fridge. Through Scott's job, we can get great pricing with Pacific Kitchen and Home so on Saturday while it rained, we went to their showroom in Best Buy to shop. We ended up with way more than what we originally planned but are very happy.  Our choices:

Range Top:
Thermador 48" Gas with Grill







Dishwasher:
Thermador Star Sapphire





















Ovens:
Thermador 30" Double Wall Oven





















Warming Drawer:
Thermador











Refrigerator:
Samsung 34 cu. ft. with the option to have the bottom two sections be refregerators or freezers.




















Wine Fridges:
Whirlpool




















Washer & Dryer:
Samsung 5.6 cu. ft. front load washer and 9.5 cu. ft. dryer.
























We planned on everything but the wine fridges and washer & dryer but we are happy to not have to worry about moving our current set. Also, the new set is over-sized so we will be able to wash a King comforter without any trouble.












Friday, October 23, 2015

Rain Delay....

The foundation is ready to be poured but because of some rain, we will have to wait until Monday.

The steel went in on Wednesday and Thursday, the plumber finished Thursday afternoon.  Our final structural inspection is today.  We should be pouring Monday.










This part of the process is pretty boring to me. I have a huge fear of stepping on a nail or tripping over something and hurting myself so I tend to take pictures from the street and not walk around too much.  The pool will stop progress on the house for about 3 weeks so they can dig and pour the pool so not sure how much updating I will do.  We are starting to pick finishes for the house so I can post some pictures of that.

Monday, October 12, 2015

Week 3

Week three was a pretty big transformation. We started Monday with a completely clear lot:


By Friday afternoon, the foundation was framed and ready for the plumber:


The plumber should start today and be done by Friday. Once everything is approved, the foundation will be poured.  After that, things will come to a stop on the house and the pool will start. The pool will be in the back right hand corner of the lot and should be very close to the back patio. Since it is so close to the house, they want to dig the hole before the house gets too far along.

Thursday, October 1, 2015

Bye Bye House

Today has been a pretty busy day.  In true Parris fashion, we closed on the house/loan at 11 am, had lunch around noon, and made it to the house just in time to watch it all come down around 12:45.  We only waited 45 minutes for the ink to dry before we started construction and technically the loan funded around 2:45 pm so we were a little too quick to tear the place down.   The house we live in now, we got the call that the loan had officially funded at 4:30 pm and by 5 pm we were taking a wall down. I guess you could say we like to move quickly once we have a plan.

We really put on a show for our new neighbors.  We have told the neighbors close to the house what our plans are but we didn't really give them an exact start date since we have been waiting on the bank all week.  So today when the bulldozer showed up, I think everyone was waiting on the show to start.  We got to meet a few neighbors we haven't seen before and we all stood around and watched.    We both feel so lucky to be moving back into a neighborhood we love and to be surrounded with great understanding neighbors.  Construction next door is not an easy situation and we have been really lucky to have neighbors who understand the process. My Dad has a better video from start to finish that I will try and post tomorrow. Until then, enjoy this short clip: